D

Dave_

Imagine:

London council block, concrete floors and ceilings (no voids!) hard brick walls (very hard exterior) slightly forgiving interior. The entire installation is pretty much bombproof and wired in pyro, chased into the walls, ceilings, floors, etc. Safe zones are not really a thought, cables are run everywhere, diagonally etc.

The customer wants various points added (recessed) everywhere. There is a single socket in each bedroom and the lounge.

In the hallway there is a clifton/mantel unit housing an old brown wylex 3036 board

. 16th edition update - surface trunking all around the hall with 10mm g/y cables to incoming services. customer wants these embedded and out of sight.

I actually walked away from the job. Worried about the implications of my Makita chaser cutting through a pyro. I would be f*****d.

thoughts gentlemen????
 
carry out brief test and inspection first to see if the exsting pyro circuits can be added to.
chances are they'll be ok.
either that or think f*** it , i cant be arsed , rewire time.
;-)
 
I would tell the customer the risks so if you do go through one they are prepared to pay to rectify it so it doesn't come out your pocket. Works work crack on with it.
 
Imagine:

London council block, concrete floors and ceilings (no voids!) hard brick walls (very hard exterior) slightly forgiving interior. The entire installation is pretty much bombproof and wired in pyro, chased into the walls, ceilings, floors, etc. Safe zones are not really a thought, cables are run everywhere, diagonally etc.

The customer wants various points added (recessed) everywhere. There is a single socket in each bedroom and the lounge.

In the hallway there is a clifton/mantel unit housing an old brown wylex 3036 board

. 16th edition update - surface trunking all around the hall with 10mm g/y cables to incoming services. customer wants these embedded and out of sight.

I actually walked away from the job. Worried about the implications of my Makita chaser cutting through a pyro. I would be f*****d.

thoughts gentlemen????

Rewire completely.

All surface.

IN PYRO
 
Also if you use pyro, the chases will be smaller and shallower due to the smaller size cable, and tight up in the corner and you will only need to chase deeper at an outlet to accept the glands, and you won't need to use a split board or rcbos, only in the bathroom. I often use pyro when wiring for fridges and boilers to eliminate the use of rcds, as I think they are an over the top requirement.

I worked on similar back in the eighties, but they were wired in conduit, which we just pulled new singles through and yt2 and 4 used for extra points. My labourer and me could wire a 3 bed flat in 8 hours, and the plastering was done by others. The walls were concrete, but a breaker made mincemeat of them.

Have a re think and you might even consider doing it, and just think no floorboards or carpets to roll up or fit back, a pleasure to do.
 
Also if you use pyro, the chases will be smaller and shallower due to the smaller size cable, and tight up in the corner and you will only need to chase deeper at an outlet to accept the glands, and you won't need to use a split board or rcbos, only in the bathroom. I often use pyro when wiring for fridges and boilers to eliminate the use of rcds, as I think they are an over the top requirement.

I worked on similar back in the eighties, but they were wired in conduit, which we just pulled new singles through and yt2 and 4 used for extra points. My labourer and me could wire a 3 bed flat in 8 hours, and the plastering was done by others. The walls were concrete, but a breaker made mincemeat of them.

Have a re think and you might even consider doing it, and just think no floorboards or carpets to roll up or fit back, a pleasure to do.


No need for glands, you can get pot gripping back boxes. But i would still prefer the glanded back box fixing myself for sockets and the like!! I'd probably use the pot grip boxes for ceiling points and light switch positions though...
 
MICC ...... the lost art, so many run scared from it nowadays and as I understand your not trained anymore to terminate it yet its still used throughout the industry ...well excluding domestic...... I cant believe they still come out of college without been able to terminate MICC and yet they believe they are fully trained electricians...
 
Some of them can't even terminate T&E or work at heights!!! ???

t&e

one guy that was at college at the same time as me passed all his tech certs and couldnt wire a simple lighting circuit.

from a 2"x2" trunking to a 1/2 metre run off 20mm plastic tube.

in singles, they were scratching there head wondering why it wasnt working (no neutrel at lights)
 

OFFICIAL SPONSORS

Back
Top