I'm thinking this is a tower with a platform at about 3 to 4 metres

The people you need to talk to are PASMA - Home They are the recognised industry body that oversees training on scaffold towers
 
I would think something like this:

Youngman 377518 Minimax Tower (Stage 2) 3.7M working height.

And whats been done previously can't be undone but can be done right in the future.
 
There was nothing wrong with the good old days when we put a couple of scaffold boards between 2 youngmans and if that wasnt high enough added a milk crate with a pair of steps on top
 
Their was nothing wrong with a folk -lift truck a hung-over driver and a pallet .... ruddy H@S has the work place a mind field of regulation :nonod:
 
When he says 2 stage tower I picture something like this that would allow teaching of good working practices whilst at height. You can only put the working platform across the top of the first stage if it's a 2 stage tower. The second stage forms the rails to prevent man overboard.

View attachment 20660

That's called a podium mate, ATM there are no qualification requirements for using these but I wouldn't be surprised if this changes, these are what step ladders were banned in favour of.

The op is referring to a proper ally tower, 2m high sections built in situe with a final working height of anything up to 12m. IMO the op should be at least qualified to PASMA standard to be instructing on this.
 
Surely the lads companies should be getting them PASMA trained. It's one of the first courses we put our lad on!
 
ImageUploadedByTapatalk1379575965.144074.jpg

That's what it looks like, notice my complete disregard for H&S !! :-)
 
Darkwood. We do not teach it, but it has always been a sticking point with management that we refuse to teach it based on the fact that none of us are certificated to any degree in scaffolding....of any type. The reason I ask is that it has come to that time of year again where we are being asked to do it and the whole debate has started again. What I'm looking for is some advice/guidance on the issue from guys who are actually dealing with this on a regular basis so that I am better informed for the debate.
Hope that clears that up for you.
 
Darkwood. We do not teach it, but it has always been a sticking point with management that we refuse to teach it based on the fact that none of us are certificated to any degree in scaffolding....of any type. The reason I ask is that it has come to that time of year again where we are being asked to do it and the whole debate has started again. What I'm looking for is some advice/guidance on the issue from guys who are actually dealing with this on a regular basis so that I am better informed for the debate.
Hope that clears that up for you.


Reread your own worded opening post its very ambiguous... it gives the impression you are actively training your students in scaffolding use and that you are been told you are not in a position to do so.... i replied to your post as it read, if its not what you actually meant then you should have made it clearer, if as you have not yet trained anyone as you now say it seems a strange way to write an opening post but i take you at your word and now you have explained better consider my previous post retracted.
 
Last edited by a moderator:
Could not be arsed to read the entire thread, all four of my eyes are goosed so apologies if im reiterating previously made points.

You can't build a scaff onsite without having IPAF (technically). So regardless whether the lads were taught at college or not they would still have to do an IPAF course like the rest of us.

That being said every apprentice at some point or another ends up being ditched with tons of scaff to build, and i would say that some tuition is better than non at all.

Its not exactly rocket science anyway, i'm sure there are a ton of qualifications you need to be an instructor/assesor however thats not technically what you are trying to do is it?

If they end up having an actual module on scaffold then i personally think you should be a trained IPAF assesor and the lads should get their IPAF at the end of it.

If you are showing them how to build use scaff as just something that will help them day to day then i think you should just do your IPAF yourself and pass the information on. Thats all supervisors do on site and its fine for them, and the lads won't technically be allowed to build one unsupervised anyway without doing the qual themselves.
 
Could not be arsed to read the entire thread, all four of my eyes are goosed so apologies if im reiterating previously made points.

You can't build a scaff onsite without having IPAF (technically). So regardless whether the lads were taught at college or not they would still have to do an IPAF course like the rest of us.

That being said every apprentice at some point or another ends up being ditched with tons of scaff to build, and i would say that some tuition is better than non at all.

Its not exactly rocket science anyway, i'm sure there are a ton of qualifications you need to be an instructor/assesor however thats not technically what you are trying to do is it?

If they end up having an actual module on scaffold then i personally think you should be a trained IPAF assesor and the lads should get their IPAF at the end of it.

If you are showing them how to build use scaff as just something that will help them day to day then i think you should just do your IPAF yourself and pass the information on. Thats all supervisors do on site and its fine for them, and the lads won't technically be allowed to build one unsupervised anyway without doing the qual themselves.

IPAF has nothing to do with scaffold :-/
 
IPAF = International Powered Access Federation, i.e. Scissor lift/ Cherry picker.

Prefabricated Access Suppliers’ and Manufacturers’ Association (PASMA) i.e tower scaffold erected by user.
 

OFFICIAL SPONSORS

Back
Top