from my experience of working on a council contract (not pricing ect but on the tools). The work is very cut throat. and its often chosen just on price. before i qualified, i was on a council contract, and i know for a fact that there was no testing carried out on the works we did, and that the foreman was filling in the test sheets for £6 a go.
A spark raised an issue (he carried his own tester, but was not asked to fill in the test sheets), regarding a very high EFLI on a steel conduit install (prefabed concrete). I checked it (it was weird that the boss/----er asked me to check a sparks test results, but i went with it), and it was very high circa 40 ohms from memory. I told my boss that i thoguht that maybe the conduit had corroded, and that it would be best if we pulled a CPC in. I was told that i didnt know what i was doing, as i was only a mate at the time.
The frim i worked for must of wired 100's of houses on that contact, and "inspected & tested" lotrs more. I would be very dubious about the quality of the work. I realised it waswrong, and left shortly after i cottoned on to what was happening. Tobe honest i dionbt thin k i would tender for council work, based upon that experience, unless i was evry unlucky, and worked for an out and out cowboy.