Darkwood

Ordered A.B.B. 125amp 3ph switch/fuse isolators for a job i specified i would be using 70mm cable and can they tell me the bolt size so I can order the correct lugs .... so far so good!#

Connecting up today bolted all the phases down then came to the N- which was just a straight through screw terminal separate connector to the side but wait a minute its max 50mm aperture :sad3: .... rang the wholesalers up who ordered all the gear and confirmed he requested as i asked for 70mm terminations...

Got A.B.B.'s number and rang them asking how im supposed to fit a 70mm cable in a 50mm hole..they answered that I don't require a N that size and i could use the next size down???
Eh! What - so without even asking the basics and knowing the cable calcs etc you told me ive got it wrong!

Well we never had this issue before.. I said I requested 70mm adaptability and you haven't complied, I asked you why and you fob me off will ill educated reasoning which implies I don't know my job.. can I speak to someone in charge?

'Can you hold on a minute sir!' ... line goes to crappy music for 30seconds... then 'sorry we will have a larger N block sent out right away but you understand these are lugs only' CHRIST ON A BIKE!!! ...so are all the other phase terminals so why would this be a problem .....

Im dumb struck - obviously someone has messed up their end and tried to fob me off ..Im happy with the products and have used them and got what I requested in the past but looks like i got a numpty sending out my order and an even bigger one dealing with my complaint ..:hammer:
 
As they were telling me that i didn't require a 70mm N i assume its someone with moderate education of the field but obviously has a misguided view in some areas... TBH i know sales people at trading counters like Scatts that know there stuff and are highly educated in their field but think i shouldn't really have to explain my N is 70mm because its part of a 4core SWA feeding a 45kw machine outside while run in ducting underground and after cable calcs i exceed there standard N block ... i was waiting for them to say snipp a few strands off to get it in :rolleyes2:
 
I will not touch it now , we had several problems with them on a 1MW field array we were subbed in to cable and commission last year .
The worst one being a small fire in one of the feeder dis boards that had originated from the fixings on the bus bars internal to where the mcb connects , luckily this was in a further metal enclosure mounted out in the middle of a field under one of the rows of panels !

It has been 6 months and I am still waiting for ABB to have the courtesy to let me know their findings ( not that I expect any more than it was our fault ) !
 
Just finished the job... and really unimpressed with A.B.B gear altogether ... the neutral links they sent were for another panel i had to adapt them then self tap and thread the box to fit them ... really peed off at the quality i mean i specified 70mm will be lugged to it and we got a 125amp switch fuse and the bus connections were a 6mm bolt on a nervingly small metal tab.. yes big enough to handle the load but fitting a 70 lug on it thats twice its width is crap...

This was a rush job so had to be ordered and delivered next day so were stuck with whatever wholesaler could get at short notice, ill be ringing ABB to give them some 'freindly' words :dita:
 
You will not get anywhere with them in my experience , but at least you can say that you tried !
They were already on patchy ground with us after a fault on a brand new MCCB / earth shunt trip combo on a new grain store complex we installed earlier on last year , in which one of their so called technical staff were so rude and belittling to my other director that he threatened to close our account at the wholesalers , over it !
 