cliffed

~
Arms
Just don't believe the way some people don't give a damn,told to go to a job last week,put up 21 surface mount fluros in school hall,got there the new acoustic ceiling was put up,without imforming our company,no 1st fix of cabling,original lighting points completely in the wrong places,had to fish over ceiling to install cables,complete nightmare,instead of 2 days it took 7 days.Spoke to boss of main contractor,obviously blamed our company,also the guys who put the ceiling up were on a price so they wound not of noticed cables missing,can you believe how thick some people are,keep taking the tabs.
 
Back in the building boom I was in charge of a students acomodation block 1 room apartment went sick 1 day plasterers cut cables off at floor level plastered the room Pr-ts I got a mans nether regions telling off, some people
 
Cliffed the problem is we will always be last in line other trades always think of themselves. the problem with us electricians is that because we are the most intelligent trade going, and we care about our job we always try to consider the next tradesman that's got to follow us and so usually do what we can to make life easier for them. Maybe we need to lose a load of brain cells and become carefree like plumber's and builders.
 
Cliffed the problem is we will always be last in line other trades always think of themselves. the problem with us electricians is that because we are the most intelligent trade going, and we care about our job we always try to consider the next tradesman that's got to follow us and so usually do what we can to make life easier for them. Maybe we need to lose a load of brain cells and become carefree like plumber's and builders.

completely agree,its all very frustrating,our company will be sending the additional costs onto the main contractor,but can you see them paying it,i don't think so, cheers
 
Just don't believe the way some people don't give a damn,told to go to a job last week,put up 21 surface mount fluros in school hall,got there the new acoustic ceiling was put up,without imforming our company,no 1st fix of cabling,original lighting points completely in the wrong places,had to fish over ceiling to install cables,complete nightmare,instead of 2 days it took 7 days.Spoke to boss of main contractor,obviously blamed our company,also the guys who put the ceiling up were on a price so they wound not of noticed cables missing,can you believe how thick some people are,keep taking the tabs.
listen...its nowt new isn`t them kinds of shyte...

reminds me of this one time the wet pants came along this one day and pulled all his barrier pipe into our holes..

i cut it all at each joist...and dragged it all out....
left my number on a bit of paper as well....just in case he didn`t like it...
 
Many moons ago when I was still a lad, I was working with an Electrician Terry is name was nice bloke if you didn't upset him, doing some 1st fixes on an estate back in the 70s things have changed a bit since, anyway we needed to get some 7/029s (2.5s to all you whipper snappers) we used to run then down the cavities in those days. There was a small joist missing, Terry said to the Chippy "would it be OK to use the large hole in the block work to fish the cables down2 " no probs" said the wood butcher "I'll cut a a notch in the block work when I fit my joist" all good until we went back, Mr Wood had ripped out our cables, fitted his joist and fox trot oscared, Terry gave him a good kicking , literally left me to face a hoard of irate wood butcher relations not funny
 

OFFICIAL SPONSORS

Back
Top