O

Octopus

OK, here we go again.

Part built outbuilding, builder no longer around, electrics mainly first fixed - what do LABC's around the country "demand" from someone wanting to do the 2nd fix/completion??

Customer keen to do the right thing?
 
if you can verify the standard of the 1st fix there's no reason for you not to complete the job and cert. it.
 
OK, here we go again.

Part built outbuilding, builder no longer around, electrics mainly first fixed - what do LABC's around the country "demand" from someone wanting to do the 2nd fix/completion??

Customer keen to do the right thing?


If the first fix was accessible and visible then I might consider 'adopting' the installation and completing it along with certification & notification.
 
If you can't see the whole installation then I can't see how you could possibly be happy tp adopt it and certify (EIC) in your name along with notification for Part P.

Then again, you could complete the work, issue an EIC, detail what has been carried out by you and what hasn't.

Hmmm, not sure really.
 
Last edited by a moderator:
3 part form ??? you didnt design or install it dont know any other way unless you can physicaly check everything thats been done already
 
Problem solved, customer rang saying another sparkie has said he'd sign it all off - and told the customer not to tell building control.
 
Problem solved, customer rang saying another sparkie has said he'd sign it all off - and told the customer not to tell building control.

Wow Murdoch mate can't ask the owner for this sparks name can you?

I have this ring final on a 63amp MCB, done in 0.75mm flex, I tried to put it on a 32amp as you should but the welding machines kept tripping it, so therefore a 63amp, anyways it's sound mate the flex is lovely and pliable and holding well, but just need someone to sign off an EIC for me, this sparks sounds like the man for the job.
 
You're right regard the solicitor, seems crazy. Only reason I asked about the planning is they'll probably be asking for electrical certs for the LABC to do the final sign off anyway
 

OFFICIAL SPONSORS

Back
Top