hey guys, CU change........34 OHMS ZE on TT install, with a 6 MM/SQ main earth. Do I need to upgrade to 10 or 16mm, for certificate?

Cheers
 
id dig a 100ft hole insert new 100mm x 10 rods or untill your rod ends up on a bbq in oz, and back fill in with magic tt dust,otherwise you will be electrocuted...if you read the other posts that is..tho its should be fine..:ninja:
 
Last edited by a moderator:
id dig a 100ft hole insert new 100mm x 10 rods or untill your rod ends up on a bbq in oz, and back fill in with magic tt dust,otherwise you will be electrocuted...if you read the other posts that is..tho its should be fine..:ninja:

So the 10 rods would add up to a meter total length, why the 100ft hole?
 