Can someone remind me, I can't find this in regs.
I recall from lessons that if one alter part of a circuit, then the entire circuit now needs to be upgraded to current regs?
Is this the case? - where is it found?
For example, say I take a existing ring final which has had a recent periodic (and OK). Just for example, say it might have some cables outside a zone, or clipped too close to the surface, or perhaps smaller detail like backplates without gromets or without earth sleeving.. Yet otherwise it's in good condition and measures well.
Let's say I need to extend this ring.
Does the entire circuit need to comply now? - ie would I need to replace the older parts with cables not complying back into zone, and to fix all detail like gromets/sleeving etc?
Justin
I recall from lessons that if one alter part of a circuit, then the entire circuit now needs to be upgraded to current regs?
Is this the case? - where is it found?
For example, say I take a existing ring final which has had a recent periodic (and OK). Just for example, say it might have some cables outside a zone, or clipped too close to the surface, or perhaps smaller detail like backplates without gromets or without earth sleeving.. Yet otherwise it's in good condition and measures well.
Let's say I need to extend this ring.
Does the entire circuit need to comply now? - ie would I need to replace the older parts with cables not complying back into zone, and to fix all detail like gromets/sleeving etc?
Justin