I visited a friend in Devon recently. I guess the supply head to meter cable is similar to the OP's. Do they do this to make it harder to tap off the supply before the meter? It was originally an overhead supply, but now it runs up the front wall and through the building somewhere before it gets to the meter box on the back wall.

