It's a pitty it's on your parents gaff...

My tuppence worth...bite the bullet on this, fit the foam, rant & rave for abit - then, when you're next on site somewhere else take your anger/frustration out on the next plumber you see...move his pipes, drill them, kneecap him whatever you want...

You've just got to tie them all with the same brush :) plumbers are all the same, they're all related aswell :38:
 
The safety pressure relief pipe is another matter, and if it gets to the point of discharging it will be well above 100 degrees - more than enough to boil a t+e.

......... and that's why the discharge pipe should NEVER be above a window or doorway and must be bent back or fitted with a cowl to direct the discharge towards the wall.
 
Well I have to say that some of the posts in relation to this thread have cheered me up no end, so thanks for everyone involved. :clap:

a quick fix might be to get him to fit some of that foam type insulation thet;s to stop pipes freezing. it's quite cheap and can be fitted without disturbing the pipes.

As the space between the pipework allowed me to place two layers of 9mm foam to both pipes all of the cables seem to be okay. I ran the heating to a high temprature for a few hours and the second layer of foam was still cool to the touch, so I guess that world peace has been restored ... for now!!! :grouphug:
 
Well I have to say that some of the posts in relation to this thread have cheered me up no end, so thanks for everyone involved. :clap:



As the space between the pipework allowed me to place two layers of 9mm foam to both pipes all of the cables seem to be okay. I ran the heating to a high temprature for a few hours and the second layer of foam was still cool to the touch, so I guess that world peace has been restored ... for now!!! :grouphug:

I aim to please ........................ but I often miss. :(
 
Well I have to say that some of the posts in relation to this thread have cheered me up no end, so thanks for everyone involved. :clap:



As the space between the pipework allowed me to place two layers of 9mm foam to both pipes all of the cables seem to be okay. I ran the heating to a high temprature for a few hours and the second layer of foam was still cool to the touch, so I guess that world peace has been restored ... for now!!! :grouphug:

are you saying that plumbers have installed heating and it actually works? well that's a first.
 
It would appear than on this occasion it is.

I even managed to nick some of their 18 mm flexi-pipe to run an earth strap under the floor before is is concreted. Much easier than flexi- conduit (and cheaper at £0.00 a metre!!!).
 
can't get cheaper than that.
 
So here I am again ....

After being in and out of hospital since I last ranted, I've returned to the job to find that they have run some of the heating pipes directly over my downlighting cut-outs.

I've measured the gap above the JCC GU10 downlighting cans, and the copper piping, and I seem to have 60mm clearance. Do you think that this is enough of a gap? If not, what could I use to protect the pipes / downlights. FYI, floor above has been laid; the cut-outs cannot be moved and I will be installing LED lamps (which should make the cans cooler).

:stupid:
 
don't worry about it. 60mm from top of light to pipe is plenty. esp. with LEDs. just hope the pipes don't leak onto the downlights, but that's the wet-pants' problem.
 
i'm going to patent my wee as carpet glue. it works a treat.
 

OFFICIAL SPONSORS

Back
Top