Yes he is right but as he never got the work till Jan this year he is at itIf the installation was designed before that particular regulation came in to effect then he is correct, he should be installing in accordance with the regulations it was designed to. If you wish to make a change to that design then it would likely be a chargeable extra/variation
Yes he is right but as he never got the work till Jan this year he is at itIf the installation was designed before that particular regulation came in to effect then he is correct, he should be installing in accordance with the regulations it was designed to. If you wish to make a change to that design then it would likely be a chargeable extra/variation
Yes he is right but as he never got the work till Jan this year he is at it
He was not involved with previous phase. It was another subbies that done that. Since they went under he has been taken on to provide the electrical package for this phase. ( long story from what I can gather its his brothers company that went bust and basicly handed him the works.. a lot of secret hand shakes going on )What do you mean by ‘never got the work till jan’?
Do you mean he was asked to start the design in January or that he was given the work in January having completed the design at some time prior to that?
You splashed out thenJust in case you do not have a copy, I think this may be considered fair use!View attachment 43374

Yeh had to really or the course would have been a waste of money you are lost without those BS books there is no way you can figure your way around without them so got the two BS5839/1 and 6 and the BS5266/1838/50172 for the emergency lighting. Ouch!splashed
He’s quite correct.I have been arguing with a subbie on a site . He says its ok to fit a plastic board as the housing scheme was all designed in 2015 even though phase 2 has all metal boards. He has bought or acquired 110 of these cu and thinks he can use them on site. Lol now I'm just waiting to see what corners he will try cut to recoup the £ he has lost on these boards. Why and how he gets any of the work I dont know he has a secret handshake is my guess. Any way i suggested the light to him as located in cupboard under stair ( cu issue even worse ) and thought it would be a present safety feature we could use ( pride on our product and all that )
He might be right but is it not a bad practice especialy from what's memt to be a reputable company to allow him to do it. After all if a house owner gets it tested next year they will flag up a C2 for it ?? Or is that wrong thinkingHe’s quite correct.
likely take all the protective devices and din rail out and put on empty metal boxes.I have been arguing with a subbie on a site . He says its ok to fit a plastic board as the housing scheme was all designed in 2015 even though phase 2 has all metal boards. He has bought or acquired 110 of these cu and thinks he can use them on site. Lol now I'm just waiting to see what corners he will try cut to recoup the £ he has lost on these boards. Why and how he gets any of the work I dont know he has a secret handshake is my guess. Any way i suggested the light to him as located in cupboard under stair ( cu issue even worse ) and thought it would be a present safety feature we could use ( pride on our product and all that )
If I recall correctly C3 where under a stairs in ESF best practice guide.will flag up a C2 for it