T
Toneyz
IET/BS take note.The viper book is better because it's in a binder that you can change pages when the relevant regs change, saving a fortune over time.
IET/BS take note.The viper book is better because it's in a binder that you can change pages when the relevant regs change, saving a fortune over time.
he was not going to sign off the gas cert
had to get my regs book out and convince him which took some doing.
Most types of electrical installations are fitted with main equipotential bonding which is connected to the installations earth terminal. blah blah blah
I am required by the gas (installation and use) regulations, to inform you that any necessary equipotential bonding work should be carried out by a competent person. Blah blah blah
Water clown ha ha ha haI’m doing 2/3 Worcester’s a week at the moment and none of the current models need a volt free roomstat, they are all 240V for standard controls.
I wonder if the water clown is getting this confused with using the Ls terminal to supply external controls.
I met a plumber the other day who insisted that the boiler supply should be via a plug now.
Need to wire a supply to combi with LNE connections, and 2 volt free cores for room stat.
I don't really see why I can't use 5 core flex for this, as all cores insulated to 500v, but plumber insisting they need to be in separate flexes...any thoughts?
Cheers
Some manufacturers instructions......can’t remember off the top of my head though, state a separate cable should be used for the volt 3 connections.
CoolManufacturers instructions are guidance only and don't have to be followed, especially when they are wrong.
George/Winston1 !Manufacturers instructions are guidance only and don't have to be followed, especially when they are wrong.