B

berko

Through my many Google searchs relating to electrics over the years, I keep finding myself here... So this time, I'm going to just make a thread and ask you guys directly instead :P

1. I have made a few changes to the wiring in my house one such as the added sockets in the attic are I belive, not notifiable, however the added sockets in the kitchen the added shower circit and the sockets/light in the shed are, I understand that. I of course did not notify before hand so could I just get a spark in to certify now and everything be okay? I belive that everything I have done is up to regs so it would just need a profesinal eye and a test.

2. I have been wondering why, if I am standing on a completely non conductive ceramic floor, not touching anything else, i will get electrocuted when touching a live wire... where is the electric being conducted to?

3. To become a domestic spark, what tests do I have to sit? I think this would be useful for me in the future.

Many thanks,

Berko
 
Through my many Google searchs relating to electrics over the years, I keep finding myself here... So this time, I'm going to just make a thread and ask you guys directly instead :P

1. I have made a few changes to the wiring in my house one such as the added sockets in the attic are I belive, not notifiable, however the added sockets in the kitchen the added shower circit and the sockets/light in the shed are, I understand that. I of course did not notify before hand so could I just get a spark in to certify now and everything be okay? I belive that everything I have done is up to regs so it would just need a profesinal eye and a test.you could get a PIR done on the whole house installation.

2. I have been wondering why, if I am standing on a completely non conductive ceramic floor, not touching anything else, i will get electrocuted when touching a live wire... where is the electric being conducted to? i would not trust a ceramic floor to insulate me by getting hold of a live part.

3. To become a domestic spark, what tests do I have to sit? I think this would be useful for me in the future.

Many thanks, 2330. nvq, 2382, 2391, and any others you can think of. that's all i can think of at the moment

Berko
and 2377 for PAT testing.
 
1) The best you will get is an PIR NO electrician in their right mind will issue you an electrical installation certificate for work someone else have done, mainly because with out ripping everything apart lifting floorboards ect.. there's no telling how and what youve done things.

2) never touch live cables

3) I'd recommemed doing 2357, 2392, then 2391, 17th update you can proberly do these in the evening, dont bother with part p course
 
Hi Berko,
these are interesting questions,
here goes
1) Personally, I may carryout a PIR (Periodic Inspection Report) on your work, and even if I was totally happy with it, I would give you a PIR. I would not certify that work under "Part P" as I did not carryout the works and I would be unsuure of the way the works had been carried out.
2)If you were standing on a non-conductive surface and holding onto a live wire, you would not get an electric shock. You may have seen in the pas a "Cable Jointer" working live sitting on a scaffold board jointing a cable. The reason the jointer is sitting on the plank isn't to save his knees from cramps, it's to insulate him from the ground.
3)As I understand it the City and Guilds are about to change. but as the latest update to the BS7671 (IEE 17th edition regs) state that anyone who wishes to be able to sign off work under part P must be at least NVQ level 3

I'm sure someone else will be able to clarify things better then I have in some of these points.

personally I think that people who get the sparks ticket in a few months is a hazard to themselves and others.
I spent years day release at college and on site being supervised and when I came out of my time I still made mistakes.
If someone does a few months course and then set loose on the public it's an accident waiting to happen

good luck

Richard
 
1) The best you will get is an PIR NO electrician in their right mind will issue you an electrical installation certificate for work someone else have done, mainly because with out ripping everything apart lifting floorboards ect.. there's no telling how and what youve done things.

2) never touch live cables

3) I'd recommemed doing 2357, 2392, then 2391, 17th update you can proberly do these in the evening, dont bother with part p course

I have just come of a building job where the guy in charge did all the electrics, it was a full house renovation, and a full rewire and CU, he has no qualifications what so ever, did not know the difference between an MCB and an RCD, thought that sockets were earthed by the back box (hence why some are only earthed by the screws holding them). And yet, when a fully qualified time served spark came in to test, it passed with flying coulers, no probs. I've seen the certificate. Yet even I know some of it was a bit dodgy.

The live wire thing was only hypothetical, I know not to touch live wires, been electrocuted once before, and it will never happen again.

Thanks supasparxs, I know what you're saying about the certification, it is dangourous.

I have not seen these cable jointers you're talking about, but I have seen people get electrocuted before while standing on wooden floors...
 
Last edited by a moderator:
I think you mean you have had an electric shock before. If you were electrocuted you would be dead!

Errrrm, good point. But I think you still know what I mean :P

And while I'm here, I may as well ask another question that I have been pondering insted of creating another thread for a one post answer.

If the CU has an 100amp MCB, then there is the 100 amp DNO fuse, what protection comes after that, surly not a CB that is rated for 100 amp per house it supplies, that would be stupidly high and would never trip.

(I should change the title to "Alot of advice"
 
Last edited by a moderator:
If the CU has an 100amp MCB, then there is the 100 amp DNO fuse, what protection comes after that

Fairy dust is what comes before: few know and even less share, it's safer that way!!

(In a typical housing estate, there's one big cable [well, three for the pedants] and it just spurs or loops in and out up the road back to the transformer - various things the DNO use at that point).
 
Last edited:
Hmmm, fairy dust you say? I know I'm not the electision here, and correct me if I'm wrong, but dare I say it is NOT fairy dust? O.O

Oh and another question just ocuried (Sorry, but I have always been interested in electrics since being a kid, and have never met an electrision other than on a job. And they rarely have time to answer my daft questions) But... Before my house, is there a 3 phase feed and each house gets taken of each phase alterativly, or is it one big single phase cable that goes down the street? Be cause some houses do have 3 phase.
 
you need to trace the cables back to the sub station. if there are 3 men pedalling on what appear to be excercise bikes, then it's 3 phase. if there's only 1 man, then it's single phase.
 
you need to trace the cables back to the sub station. if there are 3 men pedalling on what appear to be excercise bikes, then it's 3 phase. if there's only 1 man, then it's single phase.

Just because you don't know, does not mean you have to take the **** >_>
 
Errrrm, good point. But I think you still know what I mean :P

And while I'm here, I may as well ask another question that I have been pondering insted of creating another thread for a one post answer.

If the CU has an 100amp MCB, then there is the 100 amp DNO fuse, what protection comes after that, surly not a CB that is rated for 100 amp per house it supplies, that would be stupidly high and would never trip.

(I should change the title to "Alot of advice"

erm I think you find that it's a 100amp main switch not a 100amp MCB
there is no over current protection from a main switch
 
Hmmm, fairy dust you say? I know I'm not the electision here, and correct me if I'm wrong, but dare I say it is NOT fairy dust? O.O

Oh and another question just ocuried (Sorry, but I have always been interested in electrics since being a kid, and have never met an electrision other than on a job. And they rarely have time to answer my daft questions) But... Before my house, is there a 3 phase feed and each house gets taken of each phase alterativly, or is it one big single phase cable that goes down the street? Be cause some houses do have 3 phase.

yes in the road there will be a 3 phase cable.

(and in Chesire they have little hampsters in wheels running to make there electrickery)
 

OFFICIAL SPONSORS

Back
Top