It has been reported through internal process, I dont think he will be installing meters much longer tbh, I didnt realise the "training" was soo short, frightening really!
 
It has been reported through internal process, I dont think he will be installing meters much longer tbh, I didnt realise the "training" was soo short, frightening really!

Always wondered where the failed Part P'ers went :)
 
It won't be the last. ESC have done some testing on meter tail connections. Interesting reading.


Tightness of meter tails : Electrical Safety Council

Good link, I've read this before. It appears to show that when terminating meter tails, undoing the twist in the strands so that they lie parallel is the best way of ensuring a joint that's going to last. Also that checking the screw tightness after tails have been disturbed for any reason is good practice.
 