This is when trades where trades ROFL, this would kill the DIY man forever, we have lost millions I bet in one industry fire alarms, fp 200 etc....
 
Yep the Barbican is one place where it's specified, has to be unsheathed as well.
 
To note the MICC i wired was a duel supply not parallel and i ran them up a lift shaft..... Now i await your comments on that :icon6:
 
If memory serves I think there is something in the regs for churches that stipulate pyro for certain buildings (older ones) not only for the normal reasons but for aesthetics as well.
 
If I had a pound for every end I made ofF I would be a wealthy man, I love the stuff, and miss it too, Even I carry FP200 on the van now, sigh happy days.
 
Ps when Insulation testing short the cores and earth out after test before touching or you'll learn a quick lesson in capacitance ;)
Had a lad on a job with me doing nothing but pyro for 6 months,got him every time with that one, some people never learn,still you could tell when the ends were clear,just listened for the scream lol.
 
If memory serves I think there is something in the regs for churches that stipulate pyro for certain buildings (older ones) not only for the normal reasons but for aesthetics as well.

Your'e right mate - buildings of significance museums etc. 422.6
 

OFFICIAL SPONSORS

Back
Top