easy job with radio bases... just connect them to some light circuits...couple of hours...if you have full ceiling roses not neutrals in the switches way....
Pain in the back when have to run tri core between all of them, chases/trunking floorboards etc...your day rate or two
And hope building control or local authority dont class a Grade A....!!
Slowly giving up Bill, seen a newly opened Shell petrol station last week, with building control had pulled up. Aico somkes throught the shop, back store room, staff kitchen and main office. Niciee certificate stated the design, install and commisionong complied to BS5839 part 1. Being replaced soon