G
Guest55
Current job ground to a halt for a few days so i thought i'd share the tediousness with an equally boring
photo dairy lol.
luckily im still on full pay :-D
the project ;
3 gas fired cremation incinerators in a converted church - conveyor belt of death i call it lol.

old mains , piece of junk.

new mains , shiney and modern.

new 250A dno service , the bodged tempory earthing was on the house

induction motor fans , stacked , with air bafflers on top.

Rear chimney exhaust stacks , 800 deg C inside.

inside burner chamber , 1800 Deg C , even the coffin handles are vapourised at that temp lol.

Funky tray work all over the place , not completely intergrated with building systems yet.

Was considering energizing the empty tray runs with 12v DC and racing scalectrix cars around the building lol

part 2 to follow in 2 mins after more uploads..........
photo dairy lol.
luckily im still on full pay :-D
the project ;
3 gas fired cremation incinerators in a converted church - conveyor belt of death i call it lol.

old mains , piece of junk.

new mains , shiney and modern.

new 250A dno service , the bodged tempory earthing was on the house


induction motor fans , stacked , with air bafflers on top.

Rear chimney exhaust stacks , 800 deg C inside.

inside burner chamber , 1800 Deg C , even the coffin handles are vapourised at that temp lol.

Funky tray work all over the place , not completely intergrated with building systems yet.

Was considering energizing the empty tray runs with 12v DC and racing scalectrix cars around the building lol

part 2 to follow in 2 mins after more uploads..........





