Hi guys,

Thought id share a recent eicr find with you.

An outside board controlling lamposts/flood lights, and yes the door is shut as fully as it will.

ImageUploadedByTapatalk1363901915.763988.jpg

Copper is meant to be this colour right?
ImageUploadedByTapatalk1363901980.350818.jpg

ImageUploadedByTapatalk1363901970.439141.jpg

Who needs blanks?
ImageUploadedByTapatalk1363902005.925819.jpg

Who needs armoured glands anyway?
ImageUploadedByTapatalk1363902025.790894.jpg

The cable hanging down is live
ImageUploadedByTapatalk1363902061.227044.jpg


Tim
 
Last edited:
The building is an events place, weddings ect. It was rebuilt after a fire 10 or so years ago and has had many alterations since, all done by the previous owners brother who is apparently a spark but also enjoys a drink.

I started a thread last week about the same place, it was about the db inside the building which was in a similar state. a couple of pics of it below.

Board covers dont need ALL their screws do they?
ImageUploadedByTapatalk1363903645.089510.jpg

Im sure i could fit 1 more cable in
ImageUploadedByTapatalk1363903691.918590.jpg

This db is in the main kitchen, and was cleaner than the kitchen itself.
ImageUploadedByTapatalk1363903780.637365.jpg
 
Gawd almighty !!!

I've got 5 steel lampposts in front of our office block with car park floodlights and cctv cameras on them and supply has just been changed from TN-S to PME.

Spent some time today looking into the do's and dont's of my situation then saw those photos and realised I don't have any problems lol.
 
as has been said here already....should be a little earner there....
anyway...it`l tidy up nicely will all that with a bit of thought...
 