Recent content by t0m4

  1. T

    LED driver

    Hoi, Thanks for the reply. Bright Spark: The few meters are around 30M :) and I already have them on site, with couple of drivers. Richard: I thought something similar because the drivers are already there, so I couldnt choose different one. But on the other hand, I know that this kind of...
  2. T

    LED driver

    Hi, I have to install few meters of led tape in an office. My question is connecting to the driver, which is supposed to be in the loft area. This is the driver: http://www.nationallighting.co.uk/admin/products/largeimages/12/12495.jpg How are you connecting this kind of drivers to the mains...
  3. T

    GU 10 Vs. Mr16

    Dunc: As I know in this fittings (Halers) you can't change the "bulb", so how about the warranty ? What are you doing if the fitting goes wrong ? Are you changing it for free ? D80: "The fittings cost peanuts generally, but beware that the twistlock & fire rated type may not be able to take...
  4. T

    GU 10 Vs. Mr16

    Hi All, What are you suggesting to your clients for downlighters ? I think it was better to install a low voltage downlighters, because the 35w 12V bulb made as much brightnes as the 50w 240v. And then its a big difference between 50w 12V and 50w 240V. So If the client could afford to spend a...
  5. T

    What Wholesalers do you use

    I prefer TLC, mostly because their web shop. (I can do my shopping list after work, with a cup of tea.. And next morning I just give them a list and pick up what I need, without the worry that i forget something. And I'll know how much I have to pay.) Another important thing for me: They are not...
  6. T

    PIR questions

    "at the end of the 2 way switching the last switch has no earth as it's being used as a strapper???" Yes. The low IR circuit need further investigation. This is a lighting circuit for the 2 bedrooms, and the hall-way. All together 12 down lighters and 4 wall lights. All down lighters are very...
  7. T

    PIR questions

    Hi, I'm doing my first report, and the installation what i got has lot of DIY marks on it. What do you think: -If cpc used as a line conductor in a lighting circuit ( 2way switch), code 2 or code 1 recommendation are you suggesting ? -On another lighting circuit the IR test between live...
  8. T

    Home Automation & KNX

    What do you think about KNX? Is there any alternative way for home and building control? What I can see about KNX is: -because most of the big companies are supporting it, you can find any kind of product on market for lighting and heating control, communication, etc.. -It is an international...
  9. T

    napit site assesment

    I had my assessment on Friday. I think this check list is same every year. So if this is the first assessment for you, then you couldn't have more than one.. For me Section 8-12 was problematic, but Mr. Graham was explaining these as well, and wasn't problem, that I didn't have any proper...
  10. T

    napit site assesment

    2 days left for me.. I'm nearly finished with everything, only this "quality Manual" section which is not 100% clear.. How about the Health and safety policy statement ? "Example available from NAPIT website" I don't find it.. :S 11. Details and Evidence of monitoring of sub-contract staff...
  11. T

    swa

    Actually this job will be what I want to show on my Napit assessment on Friday. So it must be 101% compatible with regulations... :D My problem with the digging, if I go 600mm deep near the fance, possibly it will collapse.. :D
  12. T

    swa

    HI, And how about, if I would clip it to the fence ? It could be problem because, the fence could be change in a future.. But if I'm clipping to the concrete column ? Maybe its as well not good, because the columns are 1,5 meter far from each other. But if I pull the swa in a plastic...
  13. T

    napit site assesment

    Yepp, just send me your mail address! ;)
  14. T

    napit site assesment

    Hi, I sent my application form last week Wednesday, This week Tuesday I got a call, from Napit about the assessment. They told me if I'm ok with next week Friday, then that's the date of my assessment. Next day (Wednesday), I got a e-mail, with "Office/Onsite Technical Assessment...
  15. T

    napit site assesment

    Hi Mate, I have my one, on next Friday.. They sent me a mail, what they want to see, so I just started organising the things. Most of the things are ok, my problems are section 8 to 12. You know this things ? Like section 8: "Record of complaints" If my company is a startup co. then this can...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock