  • I’m sure this has been covered a squillion times before but advice please. EICR on block of 5 flats all with separate supplies & meters. One boiler serving hot water via one system to all flats. Main bond to water and gas on entry to building. There is no bonding locally within the flats themselves. If main bond on entry is in place for a shared water / heating system I was thinking C3 for no local bond within flats
    EICR
    MICC supplying shed socket.
    Buried in concrete but visible in many places along its length.
    MI non insulated.
    I say C2 but electrician I discussed this with thinks C3.
    Anyone else?
  • Loading…
  • Loading…
  • Loading…
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Advert

Advert

Back
Top