Hi all
does anyone know if easycert have a user manual.
Trying to add more than 1 DB to a report its not allowing me to input more than1 set of tails and main switch and so on into the report.
i can add extra DB circuits but that’s it so any help would be good.
Cheers.
Would the only way...
Customer has had builders in (nearly finished), taken down internal walls and made extended kitchen space. Various circuits loose, and dangling off cables etc.
Customer wants quote for the kitchen which is now concrete and old plaster.
20 minute first visit confirms 16th ed’n board...
Just noticed my 17th and OSG has gone missing.........Ahhhhhhhhhh
:annoyed:
Bugger, I had all my pages marked up for quick reference etc.
Where's the best place to purchase new, ebay amazon??
Hi All
I have my trusty Megger AVO300 multimeter for sale. 2 years old but never really used in any anger so is in excellent full working condition.
Tested as accurate with my calibrated check box.
Complete with perfect condition leads and GS38 tips.
Looking for £25 posted.
Thanks
on page 4 of the report we have at the top outcome were we have to put thik,n/a,c1,c2,c3 and next to it we have location reference.when do we have to complete this colomn and what location reference to put in it?we have to do-it only when we have in outcome c1,c2,c3 or eaven when we have thik as...
virgil
Thread
certification
certsure
condition
electric
electrical
electrical installation
installation
niceic
scheme
Hi chaps. Been working in solar PV for the past couple of years so a bit out of the loop with annual inspections etc. However a guy at the local pub asked if I would be interested in doing an 'annual landlord inspection' for his insurance. He seems to think that in the past sparkies have just...
Hi all,
anyone got a editable electrical condition report open office version they could send me. got the other pdf version but the schedule of circuit details is portrait and i prefer them to be landscape.
thanks in advance.
Hi,
For sale, DVD.... Updated to 1st Amendment
Electrical Installation Condition Reports and Testing DVD 17th Edition 1st Amendment
Content includes:
The requiremnts for pre-inspection, what should be done before even arriving on site?
When do you start?
Agreeinf the Extent and...
So who likes the old wooden backed wylex boards , well here the reason i hate them the one ive been out to today just fell apart riddled with wood worm , and another reason why i hate them is for the fact the fuse cover when removed exposes live terminals , and in so many case when people use a...
Has anybody got a sample of, or whats different in an Industrial Condition report inspection schedule,
as most samples I've seen are suitable for premises upto 100A supply.
HI
NOW THAT THE PIR REPORT HAS BEEN SUPERCEDED BY THE EICR IS THEIR A CERTAIN WAY THESE HAVE TO BE FILLED OUT.
BASICALLY WE USE AMTECH SOFTWARE AND AFTER YOU HAVE FILLED ALL THE NORMAL DETAILS IN IT GIVES YOU THE OPTION TO FILL OUT 3 PAGES FOR THE SCHEDULES OF ITEMS INSPECTED FOR MULTI BOARD...
Gaz Towle
Thread
condition
electric
electrical
electrical installation
installation
I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form.
In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
I have a few questions regarding filling the Condition Report Inspection Schedule for Domestic 100A Supply.
1- On section 5 (Final Circuits) Is the SWA "Steel Wired Armour", conduit, and Trunking are part of these Final Circuits? or only the SWA?
2- 5.11 of Section 5 (Final Circuits)...
I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply.
My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
Hi
My exam on fault finding is near. I now have to fill in the new report (Condition Report Inspection Schedule For Domestic And Premisses With Up to 100 A Supply). The report consist of 7 sections. Section 1 is Distributors Supply intake equipment, Section 2 is presence of adequate...
nazoom
Thread
condition
domestic
filling
inspection
new
schedule
hi guys, wondered if anyone could give me a short run down on what is required when asked to provide electrical condition report for mobile caravans?
i mean the transportable/towable type, as i think i may be asked to do a few of these.
I have just started self employed and want to make...
Hi All,
Firstly great forum
I am likely to be undertaking the job of issuing condition reports of mobile decontamination units used in the removal of asbestos, having never stepped inside one before i am hoping you fine people can give me any advice on what to expect.
I assume it will be...