hello everyone
i recently had a new 4 KW pv system fitted in the past fews days
and have generated 10kwh in the past 4 days so am averaging 2kwh a day is this normal for location and time of year
anyone know if 'canadian solar' panels are good? was told by the fitters they are the bee knees...
loser123
Thread
england
generation
newbie
north
north east
question
Anyone any ideas?
Solar PV system just been installed but the generation meter has not moved, even though, according to the inverter 5kW has been generated
The meter is stuck on 0.55
Many Thanks
Hi all,
I've had a couple of enquiries lately from clients who have been (somewhat surprisingly) informed by their DNO that the generation meter is not Ofgem approved. Why, all of a sudden, are DNO's deciding that MID approval is not adequate/accepted? Don't they understand the history/nature...
We do apologise if this is the wrong forum to ask .
We are asking for help in these areas of Sheffield and surrounding , blackpool and surrounding , North East and Norwich and surrounding , As we are generating new customers for residential Solar Power Energy very soon via face to face where we...
a friend is concerned because the total generated value for her panels given on the Tigo website (optimisers were used as there are shading issues) is considerably higher than that shown on her ge. meter. The system was commissioned on 14th Jan and reading on gen meter is ~ 2/3 of the total...
Hi,
I am just finishing my apprenticeship this year,
I am looking to get some advice on how to get into a role on more industrial work, even transmission or generation.
Havnt got any experience in that field but would obviously be willing to be paid to match the fact.
I have even...
We have thousands of solar pv leads for able to pay customers across the uk ,moving forward with the new fit rate we see an even greater demand now that initial costs have crashed to the customer,if your looking for good quality leads postcode specific or uk wide then please get in touch.either...
robbie c2c
Thread
answer
costs
customer
generation
lead
leads
solar
solar pv
suppliers
ok lads been having a discussion on Edf fit form! ive got job with following!! 1x 1.7kw on garage 1x 1.5kw on shed(outbuilding) now treated as sep systems due to distance ie impractible to run cable back to 1 x generation meter position! how do i reg it! do i do 2 mcs certs for same property...
Just been offered supply of Landis meters but they are going fast. Not sure of current supply levels and I am not selling just passing on the contact info if anyone is stuck.
Hi
where is the best position to put the generation meter
1. Next to the main metering supply. Or
2. In the garage by the inverter
The inverter is about 15 meters away, from the mains point
Cheers
I am interested to hear how other installers have found different 'leads' companies?
We have used Solar Guide for a lot of our leads and we have a really high conversion rate with them. Definitely our best experience with them so far.
We have also used Companeo and unfortunately ended up...
Hi All,
New to the site, i have installed my first system last week, it went fine. Solar world system 3.92KW with Sunny boy inverter.
A Question... on the inverter it says it has produced 43.5KW in total to date, but on the generation meter it is only showing 5 units, are these figures correct...
- People born before 1946 were called The Silent generation..
- People born between 1946 and 1964 are called The Baby Boomers.
- People born between 1965 and 1979 are called Generation X.
- And people born between 1980 and 2010 are called Generation Y.
Why do we call the last group...
Hi All.....
I've finally got my Pachube feed looking something like presentable... please feel free to view it at
http://api.pachube.com/v2/feeds/24681/datastreams/1.png?width=600&height=450&colour=%23f15a24&duration=3hours&legend=3 Hour Plot&title=Solar Generator -...
Hi All,
First post on the forum.
I am wondering where we stand when we install a PV system on 2 seperate roof elevations, with 2 seperate inverters, but 2 meters? Can we register 2 meters with the MCS and with energy suppliers?
Thanks in advance
I have 2x inverter domestic installation and need some advice on the meter position.
In order to meter generation from both inverters, and both inverters needing a separate MCB, I need to place the meter before a 2 way CU. Would the correct approach to be take tails directly from a henley block...
Sorry if this is a stupid question. Does the AC from the inverter connect to the load side of the meter or the supply side? I assume to measure the output of the panels it connects to the load side??
Apologies if this has been answered before/ stupid question
Regards
Erf