Just a quick one, something i was wondering
The banding for Fits are 0-4kw, then 4kw to 10kw etc
If you install a 4kw dead on (16 x 250watt) system, who decides which bracket it goes in.
or should it realistically say, 0-4, then 4.1 to 10 kw.
do you see what im getting at:lol: