I've been doing mine in Bolton, that's where the exam is as well.
Have you been doing past papers? The need for it should only arise in part B as they are long answers, you may get a question like describe how you carry out an IR test on an existing circuit.
Start your answer with agreeing with the client a time and date, then state the safe isolation procedure, then onto the test procedure. Remember to include reinstating the circuit.
If the scenario is a new installation we have been told that as long as you state in your answer that as it is a new installation it will not have been energised you can skip the safe isolation.
Hope that helps.