Hi all. I'm after opinions on a proposed modification to a circuit. Would it in theory be permit table to spur from an existing socket point on a ring final in 4mm to service three sockets, in order to remove the need for an fcu? (as it will be a spur of a spur)
My reasoning is that the 4mm is adequately rated to the 32a mcb of the circuit which would remove the need for an fcu? I have tried to extend the ring but I cannot access the cable sat the correct socket so I have to use the only point available to me. There is no space for an fcu where I intend to run the new points (t.v and sky box)
I could also de-rate the circuit and split into two radials but it would be nice to keep the 32amcb. Although not standard, I can't see why it be unsafe ?
Ps...few spelling errors caused by auto fill on my iPad
My reasoning is that the 4mm is adequately rated to the 32a mcb of the circuit which would remove the need for an fcu? I have tried to extend the ring but I cannot access the cable sat the correct socket so I have to use the only point available to me. There is no space for an fcu where I intend to run the new points (t.v and sky box)
I could also de-rate the circuit and split into two radials but it would be nice to keep the 32amcb. Although not standard, I can't see why it be unsafe ?
Ps...few spelling errors caused by auto fill on my iPad