Here's one for you all, if you pull in 4 single SWAs and terminate them. How do you stop eddy currents?

I don't actually know but this thread got me thinking about it.
 
Yeah, I use these for domestic lighting circuits to account for loft insulation etc. :tongue:

Seriously, never used anything above the usual boring domestic sizes.

youre soo missing out lol.
anything above 95mm is like bending iron bars :-D
i gland using my teeth
im that hardcore !
;-)
 
youre soo missing out lol.
anything above 95mm is like bending iron bars :-D
i gland using my teeth
im that hardcore !
;-)

You're making me tired just thinking about it! I find 10mm T&E a real chore to route around. Maybe I'm getting lazy in my old age :)
 
use a non ferous gland plate or tuffnol or just throw the gland plate away crimp a lug on job done (seen it done)
 
240mm 4c swa is the biggest I've glanded , but as others have stated I find it easier to ring and gland than the smaller stuff .
 
240mm 4c swa is the biggest I've glanded , but as others have stated I find it easier to ring and gland than the smaller stuff .

240 4c is the biggest i have done so far as well , but to say it was easier than 1.5 /2.5 stuff is a bit wishful if you ask me ?
It did not seem that way to me !
Having said that , if the small stuff is from CEF i could see what you mean !:devil:
 
Normally domestic sizes followed by arguments about using the armour for earth. Have farted around with 70mm but today have been ripping out the potato measurement equivalent of 4 core 70mm lead sheathed, old school SWA. God damn it that stuff is heavy, would of loved to see back in the day sparks pulling a few hundred meters of it down a narrow cable tunnel!

Also 90mm ish singles, which had all stuck together where they've got hot and the (bitumen?) had melted
 
Biggest I have done is 2x 400mm 4 core in parallel. Was good fun. Last July I done 2x 300mm 4 cores in parallel and on the same job 2x 150mm 4 cores in separate runs. Last week it was a 70mm 4 core. I love doing the bigger SWA cable and glands.
 
Pulled in - 300mm2 4 core armoured

Terminated - 240mm2 4 core

Ripped out - 1000mm2 copper singles :)

Hardest pull was 16 ton of 240mm2 single core awa through service ducts up 7 floors onto roof, 3 on top floor, 1 on ground floor, 1 on every other floor.
 
240 4c is the biggest i have done so far as well , but to say it was easier than 1.5 /2.5 stuff is a bit wishful if you ask me ?
It did not seem that way to me !
Having said that , if the small stuff is from CEF i could see what you mean !:devil:

Ringing and glanding is the easy bit! It's getting the beast into whatever your connecting it too! Lol!
 
Here's one for you all, if you pull in 4 single SWAs and terminate them. How do you stop eddy currents?

I don't actually know but this thread got me thinking about it.

Any single core cables, will have Aluminium so-called armouring, not steel...
 