Hi all

Just wanted your thoughts on cost for wiring of a bloke of flats. They roughly contain the following

14 x double sockets, 3 x tv points, fan in bathroom with isolator, 2 smoke alarms, 7 x lighting points with switching, 1 bt point, 4 switch fuse spurs, 4 un-switched sockets, 1 cooker isolator with outlet plate.

As I have never priced a new build before would be grateful for any guidance. I have come a figure just under £6000.00 does this sound about right? I have allowed 3 weeks with me and apprentice to carry out the work. There is also a communal area leading to the two maisonettes and some outside lighting.

Thanks
 
without wishing to sound picky is your price for the 2 flats and communal area?

and how do you wire a bloke?
 
Add up your materials, add 20%, add your fuel , add the total hours at your rate plus maybe 16 hours contingency and you will be there
 
£6000 per flat? I was 1st fixing these in timber frame in a day and a half on my own!
 
At that price I assume it is just 2 flats and a very small landlords area, allowing for sub mains and distribution even this is tight IMO.
 
This price is for 1 ground floor flat, two maisonettes and the communal area supplying materials and installation. The price does not include any submains as the client is still in talks to the electricity company to see if they are runnig the rising mains. I have allowed 5 days 1st and 2nd fix per flat within that to include communal are as well. Do you think its a bit low?
 
well whats is the building construction, installation method and level of spec? way more info needed?
 
Pricing up is not my strong point, but if you think you can get it done in your time scale with profit then you cant be that far off.....
 
low level spec just basic and the building concreate blocked walls so chop the boxes in a bit ready for render then plaster finish.
 
you're doing the chopping and chasing or the builder?

- - - Updated - - -

do you own a chaser, or going to buy/ hire?
 
This price is for 1 ground floor flat, two maisonettes and the communal area supplying materials and installation. The price does not include any submains as the client is still in talks to the electricity company to see if they are runnig the rising mains. I have allowed 5 days 1st and 2nd fix per flat within that to include communal are as well. Do you think its a bit low?

So 4 CU's, 4 sets of rings and lights and 4 sets of certs.

Your price is way to low IMHO
 