OK, I was slightly off.

559.5.1.206 Consideration shall be given to the provision of the neutral conductor, at each switch position, to facilitate the installation of electronic switching devices.
There we have it CONSIDERATION - most contractors i have come across doing new builds are very inconsiderate and want to be in and out as quick as possible with no consideration for the end customer. one bunch install - normally one qualified electrician and a bunch of matesl/ labourers and a few spotty kids doing apprenticeships on college day release then another come along and test. never the 2 shall meet. anything that saves time is a bonus for the bottom line.
 
After Considering your reply , you could be deemed that you considered regulation 559.5.1.206 as considerably vague considering.
Actually I consider that 559.5.1.206 is considerably a vague regulation, mind you considering the whole BS7671 is considerably vague in it's entirety I would like you to consider that this mater is closed, considering the length of time we have had to consider the mater, what do you think? Perhaps you could consider my response, and let me know if you consider it adequate.
 
Well considering it's asked to give consideration to this in the regs, if you considered it unnecessary or couldn't be bothered you'd have to give a considered explanation to an assessor if he asked why you didn't consider it worth doing.
 