G
GLENNSPARK
yes but under part p rules....the person who ultimately signs off the work and notifies has to be present at both the design and install stages of the works....or what you would have is a few guys being part p registered ....then going round loads of installers (including kitchen fitters)..lol....like some sort of QS for hire...lol...I mean a lot of the other bodies allow testing and certing a job carried out by third party as long as they were instructing the job but NIC are cracking down on this practice where other bodies turn a blind eye to it.
Last edited by a moderator: