When working there are more than Electrical regulations to consider. Now you are into a very separate set of operational parameters, building regulations, regulations for beams mean they have very strict allowances for width, depth and location of 'chipping out' or drilling holes, hence why it must not be done unless within said allowances (don't take my word for it look up the specifics), same as location of holes size and proximity etc. A structural beam providing support over an unsupported span is vulnerable to alterations outside of 'safe' zones causing weakness in relation to the location, loads, span and size of beam. This is why I personally never 'chip' out of the top or base of a beam, and instead factor it into the pricing and time, in my opinion it's not acceptable where one should be pricing to cover completing within full regulations. As I said earlier, my point 5 rare but possible, the unknown... The trick is to learn your materials/building fabrics and how long it takes you to achieve what your customer wants-remember to walk away, if you aren't able to do it in the budget they have them don't. Just how I work ??
Yes, obviously these things would still be born in mind, same as with any job.
