Here we go, cost over rules safe practice.

Why did you under price this job in the first place?
 
Wade you say its been used for wiring inverters for motors ... in this case you will be bound to EU regs regarding harmonics and rf interference and also manufacturers instructions for the inverter and if the inverter to the motor is SY as it will require screened cable then both ends need grounding down unless otherwise instructed by manufacturer. From experience the screening requirements can vary slightly but usually all give same result.
 
Here we go, cost over rules safe practice.

Why did you under price this job in the first place?

I am not by passing safe practice as already stated i will be earthing both ends of the braid. The safety of the installation will not be compromised, i was simply asking what alternatives were available to me. it was a fairly broad open question.

Thanks Darkwood, I didn't know that, as mentioned prior, i never leave a braid unearthed, i just wanted to know more around the subject from different points of view.

I havent priced this job, it's an in house job that is required to power some new machinery that is being delivered, i am just working on a company budget guideline.
 
Difficult to explain, but if you want a single pigtail ease the braid apart, then while bending the cable into a 'U' shape push a terminal driver round the cable inside the braid then use it to pull the cable out of the braid. The first bits the hardest 'til the cable tarts to slide out, then sleeve & fit a ferrule onto the pigtail.
 
agree with spins comment earlier.
i'm working with sy flex now , tons of the stuff , all of it used for power rather than signal / control.
earthing the braid is only nessesary at one end IMO , may make life a bit easier for you if youre not using the proper glands.
and im suprised theyre costing you £30 a pack.
 
With regards to earthing at one end when you are not required to earth both ends due to EU regs on harmonic suppression and RF issues associated with the like of inverters etc i would like to make it clear it should be done at the supply end not the load end as a damaged broken earth core would render the shielding unearthed too where as if at supply end the earth core been cut wouldn't effect the earthing to the shielding.
 
Nice one spoon,

How do you make off the braid on these then? Just wrap it round the thread and tighten?
 
There's a clip on YouTube but I don't have enough posts to out up the link,
Google sy cable gland YouTube
 
If the braid was cut back and insulated at both ends I would argue that it couldn't be classed as an exposed conductive part. Yes the braid can become live upon faliure of basic insulation but it cannot readily be touched. If the braid is glanded, then essentially you would be making it an exposed conductive part and therefore it would require earthing.

Saying that, I don't work with the stuff all the time but have installed a fair amount over the years and I've always installed a proper gland at the load end.

Still not sure what side of the fence I sit on with this topic. Just thought I'd add that to the discussion :)
 
I see your thinking but its use is now been put to a reinforced flex and as so the braiding is affording some form of protection otherwise why use it, because its been utilised in this manor you must treat the shielding as if it were an armour and thus earth it, taping the ends up may hypothetically stop it been an exposed conductive part but the reason your using SY has to be taken into account and if its been used a a tough flex then it would need earthing as damage to the cable could leave the shielding live and EXPOSED at point of damage without any protective device operating.
 