As you may or may not know, the silly string that comes installed in the duct is only there for you to pull through a proper rope, which would then be used to pull your cables.

I agree with benji about the distance though.

At least one pit should be in there.

Mainly due to the fact that you will put a fair bit of strain on whatever cable you are installing when you pull it through.
 
As you may or may not know, the silly string that comes installed in the duct is only there for you to pull through a proper rope, which would then be used to pull your cables.

I agree with benji about the distance though.

At least one pit should be in there.

Mainly due to the fact that you will put a fair bit of strain on whatever cable you are installing when you pull it through.

Agree about the pit and will put one in about halfway which won't be too difficult as this is approximately where the car parking area begins and I know exactly where the ducts are.

I'm hoping to use one duct for CCTV cabling (CAT5 or Coax) and the other for electrics. Probably run a 10mm2 or 16mm2 SWA. There's no way I could pull a 16mm along that distance without a draw pit so will definitely put one in.

Thanks for all the advice guys.
 