the amount of effing and blinding done when a cable is damaged in the wall and you cant pull a new piece through as the lazy sparks previously didn't bother using any oval!

Lazy? Or cost effective? I don't use oval, I just clip direct... Why would I cut out part of my profit to make life easier for someone else 50 years down the line?
 
Lazy? Or cost effective? I don't use oval, I just clip direct... Why would I cut out part of my profit to make life easier for someone else 50 years down the line?

Or you could add the cost to your quote?
 
not just for sparks 50 years down the line !

90 percent of the time, you will be the one revisiting the job as its most likely the same customer !

say a cable gets damaged in a socket outlet, least with oval you can usually pull some slack down ?

- - - Updated - - -

Lazy? Or cost effective? I don't use oval, I just clip direct... Why would I cut out part of my profit to make life easier for someone else 50 years down the line?

is that how you think about your jobs ?
 
not just for sparks 50 years down the line !

90 percent of the time, you will be the one revisiting the job as its most likely the same customer !

say a cable gets damaged in a socket outlet, least with oval you can usually pull some slack down ?

- - - Updated - - -
is that how you think about your jobs ?

I'm not in this game to waste money mate...

I'm in it to do a job properly but efficiently...

If I do an installation, I do it correctly, within the regs and as long as all is good when I leave, I'm happy.

Sorry, but really not forking out my own cash and time, in order to make things easier for the next guy who comes along to work which may never be required...

When I install a socket or switch, I leave a few inches of cable in the backbox so the fixture can be changed, or the cable can be trimmed if damaged. I'm not about to start leaving slack and the means to draw it through, just in case it gets needed in future!
 
Never seen metal capping earthed in my life, come to that never seen it stop a drill and a screw lol
thats caus it isn`t supposed to..lol...protection against the plasterers trowel ....not mechanical protection....
 
and the once in 10 years that may happen justifies fitting conduit on every job ?
if the cables are properly laid in the PVC/metal channel...they can usually by used to draw some new in should the existing get damaged........further more, if the original installer had a bit of foresight...he would have left a loop....so if the cable was damaged at a knockout box/point...there would be enough to pull down and make off again....
 
The chemicals in the plaster can damage the life of the cable let alone the damage a plaster can cause. Always use oval conduit to protect your cables and install in a way that you could draw new cables in the future, make sure there deep enough so plaster doesnt crack come the end of the job.Dont clip direct to the wall unless builder is using dob & dab.
 
The chemicals in the plaster can damage the life of the cable let alone the damage a plaster can cause. Always use oval conduit to protect your cables and install in a way that you could draw new cables in the future, make sure there deep enough so plaster doesnt crack come the end of the job.Dont clip direct to the wall unless builder is using dob & dab.
botty hole talk again i see...
getting to be a nightly event in here now...
like i said at #24....properly installed cables in properly installed channel is a cheaper method...thats perfectly good...and dont try telling me that cables wont pull in it....
caus i`v done it....loads of times....
 
So there is no set depth in the amount to chase out? Just enough for cable and capping?
 