BUMP!!!!!!
So do we have anymore trainees willing to show us their work, It doesn't have to be huge to qualify, just some form of installation.


I would enter if i had any pics of work i have done. Had a couple of boards on an old phone (long gone).

Will certainly take some when i land another job. Have been out of work for what seems like forever now. going to make some calls monday and see where i get.
 
I wish I actually took photos of my work. Just have a random few of board changes (got less to use the more competitions I enter!)
 
Well I would say yes if it is in this thread mate, but what a separate thread dedicated to all your installs and we can see the progress all the trainees are making along their journey, showing the way you all develop your skills with experience.
Maybe one of the Team could create a sticky!!! And all new pictures can go in there.

Good idea if everyone agrees? A sticky thread that any Trainee can post up their installs with a little description of what they have done. Feel free to copy and paste your old photos from this and previous threads to get it started.

Edit:- We already have a "trainees show us your installs" thread and already have 4 pages of pictures and feed back. Do you want me to make that a sticky or start a new thread?

http://www.electriciansforums.co.uk...nly/90745-trainees-show-us-your-installs.html
 
Last edited by a moderator:
Paul if it would probably make sense to make that one a a sticky.

Regarding this competition I am slightly worried that from what a lot of the trainees are saying, they don't have any pictures to offer up for the competition which could prove unfair to quite a few of them.
 
Ok I've made that one a sticky.

It is difficult for some members to do work that they would post up for a comp in 5 weeks. If you want to extend the deadline please do so if that is ok with the Trainees. It is your and Rob's comp, long as everyone is ok with extending the entrance date go for it. Staff will help out in any way we can.


OR:-

Keep this one as it stands and I/or another Mentor (may be Sintra) can start another comp up straight afterwards for another prize? This doubles the amount of time for everyone and is fair to all. Your choice mate.


Another idea I had was to have a "Mentors install comp" in the TS? The trainees can be the judges, should be fun :wink:
 
Ok I've made that one a sticky.

It is difficult for some members to do work that they would post up for a comp in 5 weeks. If you want to extend the deadline please do so if that is ok with the Trainees. It is your and Rob's comp, long as everyone is ok with extending the entrance date go for it. Staff will help out in any way we can.


OR:-

Keep this one as it stands and I/or another Mentor (may be Sintra) can start another comp up straight afterwards for another prize? This doubles the amount of time for everyone and is fair to all. Your choice mate.


Another idea I had was to have a "Mentors install comp" in the TS? The trainees can be the judges, should be fun :wink:

This would be very interesting :smile:
 
Ok I've made that one a sticky.

It is difficult for some members to do work that they would post up for a comp in 5 weeks. If you want to extend the deadline please do so if that is ok with the Trainees. It is your and Rob's comp, long as everyone is ok with extending the entrance date go for it. Staff will help out in any way we can.


OR:-

Keep this one as it stands and I/or another Mentor (may be Sintra) can start another comp up straight afterwards for another prize? This doubles the amount of time for everyone and is fair to all. Your choice mate.


Another idea I had was to have a "Mentors install comp" in the TS? The trainees can be the judges, should be fun :wink:

Only if we get to win a few prizes!!!

Re the comp that is running, it makes sense to keep it running now and then if you and another mentor want to come up with the next one that would be great mate.
 
656fd040.jpg


One of mine.
 
656fd040.jpg


One of mine.

Show off :rofl:

Nice mate but you've missed the bolts on the front plates :wink:

This is the problem of running install comps, timing on what we are working on at this moment in time. In the next 4 weeks I could only post up a large house/mini mansion rewire. Ok the CU will be good to post up with 20 circuits on a single phase supply, now that has been interesting working out FLC with diversity lol. Or posting up the upstairs landing lighting circuit with 10 x intermediate switches (switch outside of each door as per client instructions).

Alarm install next week but I've given that task to Doody Toody for this comp. I want to do a fire alarm test rig at home, that may be my entry if completed within the comp deadline? So even for full time sparks like me, it is still difficult to post up a picture due to whatever work is on the cards for those weeks the comp is open.
 
At college today so i took some pics of my comp entry, its still a work in progress and I'm just about to start wiring it up. We manufactured the bends in the trunking and the tray, put set's in the tray and the conduits and also a running coupler in the galv conduit.

First time i'd done any of these myself so it was really enjoyable and hopefully i'll get to do some more in the future!


2015-01-28 16.04.16.jpg

2015-01-28 16.03.31.jpg

2015-01-28 16.03.41.jpg

2015-01-28 16.04.04.jpg
2015-01-28 16.02.15.jpg

Pictures are a bit blurry for some reason, think theres something up with my phone camera
 
That running coupler on the second to last photo is missing a locknut.

Look forward to seeing it wired. Well done.
 
That running coupler on the second to last photo is missing a locknut.

Look forward to seeing it wired. Well done.

Hawkeye! It also has no saddles yet... it was the last thing i did today and was running out of time so just screwed it together before i left otherwise it will go missing!
 
Question is, aside from following your spec sheet. (I'm assuming that's why your using a running coupler on a straight length like that).

Over a length that far, does it need saddles?

Just a note, I guess you won't bother on this temporary installation. If you use a running coupler in a real installation, make sure you use some galvanising spray to re seal the threads and stop them rusting.
 
Hawkeye! It also has no saddles yet... it was the last thing i did today and was running out of time so just screwed it together before i left otherwise it will go missing!
Ah that explains the Conduit box without a fixing as well then :biggrin:
 
Question is, aside from following your spec sheet. (I'm assuming that's why your using a running coupler on a straight length like that).

Over a length that far, does it need saddles?

Just a note, I guess you won't bother on this temporary installation. If you use a running coupler in a real installation, make sure you use some galvanising spray to re seal the threads and stop them rusting.

I personally wouldn't bother with the saddles but we are working to a drawing and it has either one or two saddles on. We had to fit the boxes first then put the conduit in-between to get a feel for why you would use a running couple and also where to use it in future.

Good tip on the galvanising spray, id never heard of that
 

OFFICIAL SPONSORS

Back
Top