I have not heard about the prosecutions that Markie was referring to, though I would have quite liked to have argued reg 526.5, as it states one of the following or a combination of and you could I would have argued that you are combining i and iii by the crimp/heat shrink are suitable accessories and that your plaster is forming part of the enclosure with a building material.
Several years ago I asked to renovate several school buildings and like everything else money was of the premium. We were asked to do similar by extending buried cables to new positions by joint.
What I came up with was exposing the cables for about 2 feet and sinking an architrave box into the wall so that the box was sitting about 5mm below the surface, then fitting oval tube on the cable, crimp and heat shrink and put the joint into the box, with a blank plate covering it and then plaster over.
Over the years I have done the same with repairs where running a new cable is not an option. It takes a little longer, a little more work, but I find that the result is a safe buried joint.
Several years ago I asked to renovate several school buildings and like everything else money was of the premium. We were asked to do similar by extending buried cables to new positions by joint.
What I came up with was exposing the cables for about 2 feet and sinking an architrave box into the wall so that the box was sitting about 5mm below the surface, then fitting oval tube on the cable, crimp and heat shrink and put the joint into the box, with a blank plate covering it and then plaster over.
Over the years I have done the same with repairs where running a new cable is not an option. It takes a little longer, a little more work, but I find that the result is a safe buried joint.