D

down2earth

Hi all,

Got my first Elecsa assessment in a couple of weeks, one of my jobs I'll be showing him is a CU change, I'm happy with the theory but just wondered if any of you learned chaps had any tips or tricks when doing this kind of thing,experience is a wonderful thing :)

One more thing, will I be picked up for using the wrong size earth sleeving, I've got loads of 4mm stuff which I was going to use in the garage where I'm putting a new ring main in.

Thanks in advance for any help

Down2earth
 
the nic pulled one of our guys for wrong sized sleaving during his annual inspection
 
WRONG SIZED EARTH SLEEVING???????

What the hell is wrong with these people? (not you down2earth I mean the inspectors!)

How can this possibly affect the installation?
 
Last edited by a moderator:
On my first assesment a got pulled on sleaving no blue on the black i think i will get kicked out on the next one lol i have lernt a lot this year
 
If my NIC inpsector tried to get me for wrong sized earth sleeving I would laugh in his face and join the ECA.
 

OFFICIAL SPONSORS

Back
Top