P
payney 0
I have my elecsa assessment next monday for which i decided to do a consumer unit change ,with bonding upgrade. unfortunately things havent gone well, first there was a neutral earth fault on the ring main which after a few hours of head scratching i traced to a joint under the lounge floor. secondly the top of the stairs light was wired on the downstairs lights but had stolen a neutral from upstairs lights hence more head scratching! also there was no earth loop at the top of stairs . anyway having sorted all the major problems out i noticed that the shower is 8.5 kw and only wired in 6mm twin and earth . should this be rectified or would the assessor be happy with it being a departure from 7671??? ps a week to go before assessment and absolutely bricking it!!!!