T
Looks like EPC of D status stays but must be before date of commissioning.
Apologies if this is a stupid question - so the D rating must be achieved without including the solar? The vast majority of our work doesn't qualify because if oil/lpg installations if that's the case.

Apologies if this is a stupid question - so the D rating must be achieved without including the solar? The vast majority of our work doesn't qualify because if oil/lpg installations if that's the case.
we've sneaked one in that way that just made it to a D with 1 point to spare.Interesting point about the cavity Gavin. Most of ours need boiler changes so it's a major change but the cavity situation might make a difference.