E
Engineer54
Maybe you've been abroad too long as Sussex is south coast....a long way from the broads!. My area has sandstone,chalk and clay regions.....the clay seems to be most consistant as far as Ra values go. But I am quite truthful when I state that none of the TT installs I encounter around here are anything like the TT installs which everyone claims to be installing.
Your right, i must have been out of the country far too long, getting confused with Suffolk/Norfolk area ...lol!!
The closest i've ever driven a rod to you, was for an uncle in Broadstairs Kent (along the same coastline). Can't remember what the final Ra was now, but as i remember, it was more than acceptable.
Have you ever tried soil conditioning on any of you're TT installs?? A little while ago i posted what i thought was a good idea for any electricians that deal with a lot of TT installs. It centres around buying a relatively cheap fence post auger, extending the shaft on a 75 mm auger bit to around a metre or so and using this go down a metre into the soil Fill the excavated section with Bentonite slurry and then driving in two or more 1.2m rods (or one 2.4m rod etc). This will almost guarantee you a very low Ra...

