markc123

Working alone - has it's perks but also has it's negatives...which is where you guys come in, sorry again, just getting more and more frustrated. (this is about the 5th time this year)

Completed an EICR on a bungalow last month, called back today - presuming to fix the problems. Oh, how wrong was i - greeted by a youngish sparks, who had fixed the majority of the problems but not one of the C2's because there was nothing wrong with it apart from sleeving - followed by a barrage of 'lazy ****' comments from him that i failed it and didn't put the sleeving on it.

20130513_145851.jpg

The picture - there was a 2gang lightswitch about a meter above, new 2gang2way put underneath it to feed outside lights....not sure which DIY dave had done it or why they didn't convert the above 2way to a 3way and have both lights on together, but for whatever reason they've only dropped live and neutral down from the above switch (tried to push an earth it, literally not possible, needs chasing out again). But anyway i had quoted 411.3.1.1 because the outside lights were class 1 - apparantly because the unsleeved earth is going out to them they're actually earthed and nothings needs doing....

His expression was hilarious when i asked him how it was connected to the MET and i got a 'sorry mate' reply. Client still getting build £30 for the half an hour waste.

Sorry to rant again lads, just frustrating lol.
 
I would have kept the bell end guessing for a while longer before telling him and just kept the meter running on the call out ;). What a plonker, I would be demanding another EICR be done on his remedial works to check he's done it right.
 
No green and yellow on cpc, No brown on the grey, copper showing on the line terminal, outer sheath on the 3 core + cpc is not inside the back box, No cpc to outside lights????? And he has the cheek to say its ok????


I can see your frustration mate.
 