I was wondering if it might be possible to pick someone's brains with regards to a new electricity supply. I am the treasurer of a community Hockey Club looking into the possibility of floodlighting our existing artificial pitch. It looks like we will need around 26 to 30 lamps at 2000w each requiring a maximum total of 60kw, we've also been told we need a 3 phase supply.
Our club already has a 3 phase supply but there are some concerns that
a) the club is over 200m from the artificial pitch, directly through our cricket pitches hence we'd like to avoid digging them up if we can
b) the cost of cable and of laying it those 200m is pretty expensive
c) we are not quite sure the club's existing supply can take this sort of additional load even if we got a cable installed.
So, we are thinking that given part of the pitch is only 20m from the nearest residential road, we might be able to get a new supply from SP Energy via the road supply directly to a cabinet pitch side, it might be a little more in cost but could save us a load of hassle.
Anyway, back to the point, I need to give SP Energy a KVA requirement for the 3 phase supply and I have absolutely no idea how to calculate it. It appears that if it is less than 70KVA we drop into a "cheaper" category. Would anyone be able to help me out with some calculations and if it's not too much to ask it would be really interesting to be able to understand the workings out but that's not a requirement, just for my own interest.
Many thanks, Dominic Batty.
I was wondering if it might be possible to pick someone's brains with regards to a new electricity supply. I am the treasurer of a community Hockey Club looking into the possibility of floodlighting our existing artificial pitch. It looks like we will need around 26 to 30 lamps at 2000w each requiring a maximum total of 60kw, we've also been told we need a 3 phase supply.
Our club already has a 3 phase supply but there are some concerns that
a) the club is over 200m from the artificial pitch, directly through our cricket pitches hence we'd like to avoid digging them up if we can
b) the cost of cable and of laying it those 200m is pretty expensive
c) we are not quite sure the club's existing supply can take this sort of additional load even if we got a cable installed.
So, we are thinking that given part of the pitch is only 20m from the nearest residential road, we might be able to get a new supply from SP Energy via the road supply directly to a cabinet pitch side, it might be a little more in cost but could save us a load of hassle.
Anyway, back to the point, I need to give SP Energy a KVA requirement for the 3 phase supply and I have absolutely no idea how to calculate it. It appears that if it is less than 70KVA we drop into a "cheaper" category. Would anyone be able to help me out with some calculations and if it's not too much to ask it would be really interesting to be able to understand the workings out but that's not a requirement, just for my own interest.
Many thanks, Dominic Batty.