Ah, the old 'bang test'.

Done it many times with old PILC's, some over 50 years old. One I know of is now 75 years old and still going, I re-terminated it 25 years ago.

"It's a bit low".
"Once it's warmed up it'll get better."
They did, never had one fail.

For industrial the minimum reading isn’t what it says in the 17[SUP]th[/SUP].
Based on 1M Ώ you lot would condemn every large motor or feeder circuit in a plant.

I was taught (M&Q) 1/10,000 leakage current is permissible based on the circuit FLC. So say a 550V 400A feeder. What would you let it go at?
You can work it out for yourself, I have it in a spreadsheet.
 
Exactly what they said to me!!lol "Its a rewire, if owt was wrong, the rcbo would trip within seconds"!! If I found owt wrong when I did the full tests, the company would send them back to sort it out.

All I can say, is that at the time I was still wet behind the ears and I did what they said!!! It was only after a few months, I reallised what I was actually doing!!lol
and even then they`d be talking out of their botty holes....caus it would be mS...wouldn`t it....lol..
 
By rewiring so "fast" it is obvious that your cable runs are not clipped as they should be and are they run at 90d or
at a tangent between points ?
Remember it is your competencies that your employer and yourself are monitoring.
Is the work you do all surface ?
 