Might be the wrong place for this so Mods feel free to move.....
I've got a friendly customer that I did some work for last year very interested in doing a PV install. I've been meaning to do the course / MCS for well over a year now and postponed it back in Feb 11 due to not having the time available.
Customer is well up for a 'deal' job where I'm happy to do the install at close to cost, and they know that it's my first one etc etc.
Trouble is, they now want it all done before the risk of the rates changing end of March, and I'm pretty booked solid but can make some time if needs be.
Hypothetically speaking, if I did the course next week, signed and sent all the MCS paperwork, ordered the parts, took twice as long to do the job as first one, had the inspection..... is it viable timewise or not?
I've got a friendly customer that I did some work for last year very interested in doing a PV install. I've been meaning to do the course / MCS for well over a year now and postponed it back in Feb 11 due to not having the time available.
Customer is well up for a 'deal' job where I'm happy to do the install at close to cost, and they know that it's my first one etc etc.
Trouble is, they now want it all done before the risk of the rates changing end of March, and I'm pretty booked solid but can make some time if needs be.
Hypothetically speaking, if I did the course next week, signed and sent all the MCS paperwork, ordered the parts, took twice as long to do the job as first one, had the inspection..... is it viable timewise or not?