Hi all,
I've recently got into Inspection and Testing after being on install work for several years and have a few questions regarding several grey areas:
1. How do you properly carry out IR testing of individual circuits within installations that consist of single insulated cables (usually older buildings) where the cpc and neutral conductors are most likely in the incorrect numbered terminal of their respective bars?
2. On premises where a back up generator is present what exactly has to be entered in the additional page of a periodic certificate in terms of earthing? (i use Amtech) ie: as it is generator should this always be a TT or would it be the same as the earthing system present within the main installation?
3. On installations where metallic conduit and trunking has been utilised for the cpc's is it easier to carry out R2 testing of circuits using the long lead method as opposed to R1+R2 testing?
4. Should i generally note MCCB's as overrated if they are set to a satisfactory rating but could easily be increased so as to become too high for the cable connected.
I do have a few more questions regarding I+T but I thought I would start off with the areas I wanted clearing up as soon as possible.
Thanks
I've recently got into Inspection and Testing after being on install work for several years and have a few questions regarding several grey areas:
1. How do you properly carry out IR testing of individual circuits within installations that consist of single insulated cables (usually older buildings) where the cpc and neutral conductors are most likely in the incorrect numbered terminal of their respective bars?
2. On premises where a back up generator is present what exactly has to be entered in the additional page of a periodic certificate in terms of earthing? (i use Amtech) ie: as it is generator should this always be a TT or would it be the same as the earthing system present within the main installation?
3. On installations where metallic conduit and trunking has been utilised for the cpc's is it easier to carry out R2 testing of circuits using the long lead method as opposed to R1+R2 testing?
4. Should i generally note MCCB's as overrated if they are set to a satisfactory rating but could easily be increased so as to become too high for the cable connected.
I do have a few more questions regarding I+T but I thought I would start off with the areas I wanted clearing up as soon as possible.
Thanks