Hi peeps
This is a continuation from my post of yesterday - the insurance company underwriter has now deemed me competent in as much as - I quote - "I have spoken again to our survey team and they have advised me that, provided there is no industrial/3 phase installation to be inspected, your ELECSA accreditation should be satisfactory in this instance."
What is the big deal with 3 phase? Why is this deemed to be so specialist, and do they mean only industrial 3 phase as opposed to commercial 3 phase? As in this is not an industrial site - it is commercial, and is actually easier than domestic installations in many respects.
I have inspected jobs where each phase of the 3 phases goes to separate consumer units, does this mean it is not now (individually) three phase, even though it is at its origin? And would this then have to be declared as 3 phase for the benefit of the insurance?
It's a complete load of baloney, but one has to play along with the idiots!!!!
:59::59::59::59::59::59::59:
This is a continuation from my post of yesterday - the insurance company underwriter has now deemed me competent in as much as - I quote - "I have spoken again to our survey team and they have advised me that, provided there is no industrial/3 phase installation to be inspected, your ELECSA accreditation should be satisfactory in this instance."
What is the big deal with 3 phase? Why is this deemed to be so specialist, and do they mean only industrial 3 phase as opposed to commercial 3 phase? As in this is not an industrial site - it is commercial, and is actually easier than domestic installations in many respects.
I have inspected jobs where each phase of the 3 phases goes to separate consumer units, does this mean it is not now (individually) three phase, even though it is at its origin? And would this then have to be declared as 3 phase for the benefit of the insurance?
It's a complete load of baloney, but one has to play along with the idiots!!!!