Hi peeps

This is a continuation from my post of yesterday - the insurance company underwriter has now deemed me competent in as much as - I quote - "I have spoken again to our survey team and they have advised me that, provided there is no industrial/3 phase installation to be inspected, your ELECSA accreditation should be satisfactory in this instance."

What is the big deal with 3 phase? Why is this deemed to be so specialist, and do they mean only industrial 3 phase as opposed to commercial 3 phase? As in this is not an industrial site - it is commercial, and is actually easier than domestic installations in many respects.

I have inspected jobs where each phase of the 3 phases goes to separate consumer units, does this mean it is not now (individually) three phase, even though it is at its origin? And would this then have to be declared as 3 phase for the benefit of the insurance?

It's a complete load of baloney, but one has to play along with the idiots!!!!

:59::59::59::59::59::59::59:
 
Insurers deem 1ph systems as the lower risk as this usually covers smaller jobs like domestic, retail units etc and a potential payout is thus smaller, 3ph does require a higher level of experience and competence and oftn found in larger building hence a claim may be substantially higher, the fact that most single phase supplies are derived from a three phase system is a matter of where, if you are in any part involved in working with the 3ph part of an install then you really need to include that in your insurance.... remember no insurance company wants to pay out and will find anyway possible to avoid it... unless your only gonna do a one off in the whole year then get the cover..... i work on machinery and control systems and my insurance is approx £700 ...if i was just doing domestic it would be a fraction of this.
 