Part 2 of BS7671, "Definitions", gives you your answer. :)
 
From how I have understood it to be, line is referring to a conductor the that electrical energy passes through on its own and live being a conductor which also has electrical energy passing through including neutral
 
Q. State four operational considerations relating to the electrical installation that must be discussed with the client I order to agree the limitations and plan the work?

Is this referring to page 113 of bs7671 when asked about naming operational considerations?
 
From how I have understood it to be, line is referring to a conductor the that electrical energy passes through on its own and live being a conductor which also has electrical energy passing through including neutral

See page 30 BS7671 Live part
 
Q. State four operational considerations relating to the electrical installation that must be discussed with the client I order to agree the limitations and plan the work?

Is this referring to page 113 of bs7671 when asked about naming operational considerations?

Are we talking installation or testing limitations?
 
The answer I was given by my tutor for this question was: 1. Who is in charge of what area, 2. When can be undertaken on that area, 3. The point if isolation, 4. The work that needs to be completed.

however I was going through the regs and I found the heading Operational Considerations, with other than what he mentioned listed below it.
 
The answer I was given by my tutor for this question was: 1. Who is in charge of what area, 2. When can be undertaken on that area, 3. The point if isolation, 4. The work that needs to be completed.

however I was going through the regs and I found the heading Operational Considerations, with other than what he mentioned listed below it.

What are the supply parameters
What is the building going to be used for
What external influences come into play
What does the building fabric consist ofWhat power is required etc etc
 