I had the same on a job a while back, i just poke my cables through the ceiling just a bit so the plasterer would see them but they wouldn't be in the way and what happens? They overboard the bloody lot leaving my cables above!! I was so angry! If i had caught hold of one of them i'd have thrown him in his own plaster bucket and mixed him to a smooth consistency! Some people are so inconsiderate!
Thats how i feel,its a nightmare & its not our fault,also some are acoustic panels at £50 a touch,just join up the dots i say,im beginning to have a laugh about it now,come on monday lol
 
Thats how i feel,its a nightmare & its not our fault,also some are acoustic panels at £50 a touch,just join up the dots i say,im beginning to have a laugh about it now,come on monday lol
If you can't get above, have you got and inspection camera? If you know roughly the position just cut a hole and poke it up through then use attachment or rod to pull cable through, I wouldn't be without mine now, just gotta make the best of a bad situation now bud!
 
when you made positions for the cables you would have measured out ? correct
so a square room with 4 downlights quarter ceiling and centre each section shouldnt be far off

that is if you done it that way
 
when you made positions for the cables you would have measured out ? correct
so a square room with 4 downlights quarter ceiling and centre each section shouldnt be far off

that is if you done it that way

its quite a big room,its nots just a square,bout 30 surface mounted hf fluro lights,not ur bog standard lighting fitting.A real pain
 
just wondering what u would do.New installation using lsoh t&e,ceiling now boarded & not accessible,all light positions not brought through by plasterers,site agent told them not to,its all off scaffold,fishing these into place gonna be difficult now,i think the site agent is at fault.

Are you saying the cables are in place but "hidden" in the ceiling by the board? Did you take any measurements?
 
You installed the lights to measurement so surely you know where the lights are and just drill a suitable hole, hand in and pull them out. The plasterers are not going to know where to pull the cables through are they? Standard procedure on a site to do it this way.
 
missing the point i think,they should of brought the cables through,why should i do their job for them,if i have an instruction to do the work then i will do it.Otherwise it will get done on 2nd fix,& if i make holes that can be seen it will be site agents responsibility to make good,the agent a complete ---.
 
I don't think so mate how are the plaster boarders meant to know where the cables are to be pulled through? Unless they've been wired in conduit and thats the exact point to be pulled through then fair enough.
 
I don't think so mate how are the plaster boarders meant to know where the cables are to be pulled through? Unless they've been wired in conduit and thats the exact point to be pulled through then fair enough.
they got the same plans we had,giving all measurements,they were also clipped in position,they brought all the cables thru downstairs,but told not to upstairs by the agent,i still believe its his problem now,i refuse to do it,so c wot happens
 
they got the same plans we had,giving all measurements,they were also clipped in position,they brought all the cables thru downstairs,but told not to upstairs by the agent,i still believe its his problem now,i refuse to do it,so c wot happens

Fingers crossed they don't owe you any money then!
 
its easier for the plasterer to just board over cables and not have to poke them thru boards,low IQ,but then they didn't pay attention at school so became plasters HA!
 