J
just add water sparks
The iee code of practice states that extention leads in excess of 25metres shall be provided protection by an r.c.d Does this apply to 110v leads as i an never recall seeing r.c.d on as temp 110v installs .I presume the limitation is due because the long distance effects earth loop impedance values.I have also noted that a lot of pat testers fail long lead test because testers do not realise that their is a seperate function for this.One final question is the earth bond test similar to a earth loop impedance test and can i use a multi function tester to do this as i have inkling m.f.t does not deliver 25amps but not 100% certain.