i use 10mm earth cable and solder it to the back box. and then supp bond it to the kitchen sink
 
I have always been brought up to earth the backbox as well, something I dont like to see though is some sparks bring the earth to the backbox and then a lead to the plate, Always done it the other way round myself
 
Get some fast set for drain repair go's rock hard in 5mins or less the more water you add the quicker it go's off. in is good if you want to plaster is up when gone off. I get mine off council drainage lads. Dry wall adhesive is good and fast and on cinder block with the holes i use a combination of batten and bonding plaster. Nothing worse than getting call back to a job where the box your apprentis has done that fell off when the customer pulled a plug out.
 
i use 10mm earth cable and solder it to the back box. and then supp bond it to the kitchen sink

You'r taking risks cutting corners like that Truth, if anything goes wrong you could be in big trouble.

I use 16mm earth, supp bond the kitchen sink plus every bath or shower in the house, then take each one back to the MET,

I find this good practice.
 
You'r taking risks cutting corners like that Truth, if anything goes wrong you could be in big trouble.

I use 16mm earth, supp bond the kitchen sink plus every bath or shower in the house, then take each one back to the MET,

I find this good practice.

Cutting corners maybe 5 years ago, but who bonds the kitchen sink theses days????
 
I have always been brought up to earth the backbox as well, something I dont like to see though is some sparks bring the earth to the backbox and then a lead to the plate, Always done it the other way round myself


Aye hate that to, or 1 leg of the ring to the back box a the other to the socket, then a link in between
 
You'r taking risks cutting corners like that Truth, if anything goes wrong you could be in big trouble.

I use 16mm earth, supp bond the kitchen sink plus every bath or shower in the house, then take each one back to the MET,

I find this good practice.

How dare you......there is no risk because i run my supp bonding conductors as a Ring Main!
 
10mm and 16mm bit small dont you think gents. IMHO i do find 25mm by 3 mm copper tape run round the house and all exposed conductive parts as well as extranious conductive parts tagged on by means of a 16mm. just about covers if its a long run (over 25m) i have been known to put in some rods just in case.
 
Pfft. Amateurs the lot of you. I don't trust bonding at all. On each and every job I install fully insulated floors throughout the whole building.


























Haven't had much work lately though.:confused:
 
I know I'm too late now but in this predicament, as Jason said, I have gone for readymix quick set sand and cement . full strength in 1/2 hr vv 12hrs for bonding

Incidently, expanding foam will give an excelent bond, but again you need to wait for 12hrs for complete curing and may not (nay I'll go further and say probably wont) find the box in the same position you left it in!
 
well if you insulate the floors why didnt you double insulate everything??

I mean for goodness sake man what you thinking about!!! No double insulation with all equipment placed out of reach behind barriers and IPX9 with tamperproof screws and all cuircuits protected by 10ma RCBOS with monitoring systems in place with a fully trained competent person ready 24-7. Its the way forward mark my words!.








The above statement only true if i am not paying!!!
 
well if you insulate the floors why didnt you double insulate everything??

I mean for goodness sake man what you thinking about!!! No double insulation with all equipment placed out of reach behind barriers and IPX9 with tamperproof screws and all cuircuits protected by 10ma RCBOS with monitoring systems in place with a fully trained competent person ready 24-7. Its the way forward mark my words!.


i make sure my clients wear steel toe cap insulating wellies....

good practice in my opinion...



btw..should i bond those?
 
bonding is possibly a bad idea as it may impede motion dont want to be carried away. However attatching a trailing lead from there wellies may be an option
 
Sorry to interrupt the 'bonding of back boxes' discussion, I found the quick-drying sand/cement . . . . too fast in setting to get a good job done. I tried normal sand/cement mix . . . loads of time to do the filling in well enough to please the customer, and even more time to leave it standing in the bucket for the next socket box to be refixed.

Didn't try the plaster bonding . . . bought a bag though just in case.

Oh . . . I thought it wasn't good practice to take a cpc to the box first before the socket.
 