Hi. Just wanted to double check to see if my interpretation of the regs is ok. I'm adding a 10mm bond to gas services at the request of a landlord for part of a gas safety certificate. The property is an upstairs flat, gas meter is at ground level.
The gas pipe goes up the wall and into the kitchen. I read the regs as bond to be 600mm at point of entry into house, which is relatively easy to take back to the cu. I have a feeling that the gas man may insist on the bond being made at the meter and want to make sure I'm on solid ground if I disagree. Does anyone disagree with me?
ultomately I could bond at the meter but will be a bit of a pickle, and I'm hoping I can avoid drilling an external hole into flat.
The gas pipe goes up the wall and into the kitchen. I read the regs as bond to be 600mm at point of entry into house, which is relatively easy to take back to the cu. I have a feeling that the gas man may insist on the bond being made at the meter and want to make sure I'm on solid ground if I disagree. Does anyone disagree with me?
ultomately I could bond at the meter but will be a bit of a pickle, and I'm hoping I can avoid drilling an external hole into flat.